Installation Of Hybrid Solar Power Systems Tender Notice
Description
Installation of 22 units of 04 KW hybrid off-grid solar power systems for courts at Chiniot Lalian and Bhowana through single stage two envelope procedure under Punjab Procurement Rules 2014. Eligible firms registered with Income Tax Sales Tax Professional Tax PRA and Pakistan Engineering Council category C-6 and above are invited to participate through EPADS. Original bid security amounting to 5 percent of estimated cost in shape of CDR must be submitted before the submission deadline. Electronic bids must be uploaded before 2026-06-04 at 11:00 AM and will be opened at 11:30 AM on the same day. Successful supplier shall complete installation within 15 days after issuance of purchase orders. Pro Tip: Attach valid PEC registration documents and ensure compliance with EPADS electronic submission requirements.
Organization Contact
Tags
power, electrical
Keywords Used for Search
hybrid solar power systemsClosing Date: 04 Jun 2026
Similar Tenders
Installation of Hybrid Solar Power Systems
Installation of off-grid hybrid solar power systems comprising 19 units of 4 KW each at headquarters, subdivision courts and allied offices in District Khushab....
Khushab
Punjab
Saturday 04 Jul 2026
IPL-6195
Installation of Off Grid Hybrid Solar Power Systems
Installation of off-grid hybrid solar power system comprising 19 units of 4 KW each at Head Quarter Jauharabad and Sub Division Courts Quaidabad and Noorpur Tha...
Khushab
Punjab
Saturday 04 Jul 2026
IPL-6195
Procurement and Installation of Hybrid Solar Power System
Procurement supply installation testing and commissioning of a 4 KW hybrid solar power system including tier 1 solar panels hybrid inverter mounting structure c...
Attock
Punjab
Monday 29 Jun 2026
TENDER NOTICE-17/2025-2026
Installation of Hybrid Solar Power Systems
Installation of Hybrid Solar Off Grid 4KW systems. Procurement shall be conducted through EPADS under Single Stage Two Envelope procedure in accordance with PPR...
Toba Tek Singh
Punjab
Tuesday 30 Jun 2026
Installation of Hybrid Off Grid Solar Systems
Installation of Hybrid Solarization 04KW Off Grid systems at Headquarter Chakwal, Sub Division Talagang and Choa Saiden Shah comprising 27 solar systems. Procur...
Chakwal
Punjab
Monday 29 Jun 2026
Installation of Hybrid Solar Power System
Installation of 19 off grid hybrid solar power system units of 4 KW each at Head Quarter Jauharabad and Sub Division Courts Quaidabad and Noorpur Thal along wit...
Khushab
Punjab
Saturday 04 Jul 2026
NOT_PROVIDED